Plan the cycle's inputs before you buy
The field cycle's supply plan lays out, per supply, what was planned, what has exited, what remains, and what is in stock. If stock can't cover what remains to be issued, Arlo warns you before the task stalls.
- Plan each supply by task and lot, before the work is assigned
- "Supply at risk" when the warehouse can't cover what remains
- Planned against actual cost for the whole cycle
FC-2026-SEM-40-SEM-41
September 28, 2026 – October 11, 2026Supply plan
| Supply | Planned | Exited | Remaining | Stock | Planned cost | Actual cost | |
|---|---|---|---|---|---|---|---|
|
abamecal
1 lot
|
4000.0 cc | 18000.0 cc | 0.0 cc | 3400.0 cc | $219,520.00 | $987,840.00 | |
|
agricultural oil
1 lot
|
0.0 cc | 6000.0 cc | 0.0 cc | 14000.0 cc | $0.00 | $230,160.00 | |
|
silicone adjuvant
1 lot
|
1500.0 cc | 300.0 cc | 1200.0 cc | 500.0 cc | $70,500.00 | $14,100.00 | |
|
fosetyl-aluminum
1 lot
|
2000.0 gr | 4600.0 gr | 0.0 gr | 1250.0 gr | $450,280.00 | $1,170,350.00 | |
|
PVC pipe 2"
1 lot
|
0.0 m | 160.0 m | 0.0 m | 40.0 m | $0.00 | $800,000.00 | |
| Totals | $740,300.00 | $3,202,450.00 |